AI estimating and job management for landscapers

Landscaping estimates in minutes, not hours.

Upload your plan, let our AI agents analyse it, and get instant cost breakdowns with regional supplier pricing and labour estimates, all in a polished PDF ready to send to clients. Then run the job from the same workspace: schedule, purchasing, costs and progress claims.

14-day free trial · no credit card required

Sample estimate
Commercial landscaping, Brisbane QLD
Estimate
$83,240
34 line items · 12% margin applied
  • Site Establishment$11,050
  • Soft Scapes$28,160
  • Hard Scapes$27,150
  • Maintenance (12 weeks)$11,700
  • Other$5,180
6
AI agents working from one plan
30sec
Bill of quantities per plan
<5min
To a full set of reports
14days
Free trial, no card needed
Why estimates take so long

Tired of manual landscaping estimates?

$ 1,240? ? ? hours
The problem

Creating accurate landscaping quotes takes hours of manual work. You're juggling measurements, material costs, labour rates, and supplier searches across multiple tools and spreadsheets.

12.4 m 12.9 m?
The pain points
  • Time wasted - Hours spent manually calculating measurements and costs
  • Inconsistent estimates - Manual errors leading to lost projects or low margins
  • Supplier chaos - No centralised pricing for regional materials and labour
  • Lost opportunities - Can't quote fast enough to win competitive bids
ESTIMATE Turf supply and lay$ 8,420Planting, 34 items$ 12,960Labour$ 9,810 Total$ 31,190 minutes
The solution

LandscapesPA uses AI-powered analysis to transform your landscaping plans into professional quotes in minutes, not hours.

Upload your plan, let our AI agents analyse it, and get instant cost breakdowns with regional supplier pricing and labour estimates, all in a polished PDF ready to send to clients.

Six agents, one plan

Everything the quote needs, from the same upload

Each agent reads your plan and produces its own report. See what each one does.

Estimate

Prices every scope item at your cost, working from the bill of quantities, the supplier prices and the labour plan instead of guessing. Your markups turn cost into price.

MATERIALS · SUBCONTRACTS · EXPENSES · LABOUR

Bill of Quantities

Get a complete, itemized bill of quantities with precise measurements extracted straight from your plan.

M² · LIN.M · ITEM COUNTS

Supplier Finder

Discover local suppliers with pricing and contact information tailored to your region.

LOCAL SUPPLIERS · PRICING · CONTACTS

Labour Research

Get local labour rates, crew sizing, and a week-by-week project timeline for accurate budgeting.

RATES · CREW SIZE · WEEKLY TIMELINE

Plant Specialist

Get expert plant recommendations with growing requirements and maintenance info.

BOTANICAL NAMES · CARE · SUBSTITUTES

Project Analyser

Get a full project overview: site conditions, safety & compliance, and key recommendations.

SITE · COMPLIANCE · RECOMMENDATIONS
Then run the job

The quote doesn't stop at the quote

Accept it and it becomes a project in the same workspace: a schedule, orders, costs and claims, all working from your quoted figures. See every feature.

Quotes that show cost, markup and price

The AI gives your cost for every material, subcontract, expense and hour of labour. Your default markups turn that cost into the price your customer is quoted, line by line.

  • Cost, markup % and price on every line
  • Your own labour rates, wage plus on-costs, and default markups
  • Set markups across the whole quote or one scope item, with a preview
  • Every revision kept: the client can accept any of them
A draft quote with its groups and scope items, a Your cost and markup line, a No pricing badge on a scope item with no price, and the total, GST and grand total.
How it works

From plan to final claim in six steps

  1. 1

    Upload the plan

    Add your landscaping plans and specifications as PDFs

  2. 2

    Analyse

    AI reads the plan and runs the agents you need

  3. 3

    Estimate

    Get an estimate at your cost, built from the other agents' results

  4. 4

    Quote

    Add your markups, fine-tune, and send a client-ready PDF

  5. 5

    Run the job

    Schedule the crew, order materials and track costs

  6. 6

    Claim

    Record progress and issue claims, with retention tracked

Pricing plans for every crew

Choose the perfect plan for your needs. All plans include a 14-day free trial.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.